9-Tanker (2018): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
m (Text replacement - "| year = 2018 | manufacturer" to "| year = {{Start date and age|2018|df=y}} | manufacturer")
No edit summary
Line 21: Line 21:
| water_capacity    = 1000 USG
| water_capacity    = 1000 USG
| foam_capacity      = 30 USG
| foam_capacity      = 30 USG
| delivery_date      =  
| delivery_date      = April 25, 2019
| inservice_date    =  
| inservice_date    =  
| dedication_date    =  
| dedication_date    =  
Line 96: Line 96:
| construction_started  =  
| construction_started  =  
| construction_complete = February 2019
| construction_complete = February 2019
| delivery_date        =  
| delivery_date        = April 25, 2019
| purchased_from        =  
| purchased_from        =  
| purchased_date        =  
| purchased_date        =  
Line 112: Line 112:
{{New_City_Apparatus_Navbox}}
{{New_City_Apparatus_Navbox}}


[[Category:In Production]]
[[Category:Recently Delivered]]
[[Category:2018]]
[[Category:2018]]
[[Category:Rosenbauer]]
[[Category:Rosenbauer]]

Revision as of 20:04, 25 April 2019

9-Tanker
Overview
Year 2018; 6 years ago (2018)
Manufacturer Rosenbauer
Type Pumper
Chronology
Predecessor 2012 Pierce Pumper (9-Tanker)


At-a-Glance
Model Commander
Features
Pump Capacity 1750 GPM
Water Capacity 1000 USG
Foam Capacity 30 USG
Notable Dates
Delivery April 25, 2019

General

  • Apparatus Type: Pumper
  • Manufacturer: Rosenbauer
  • Color: Red over white over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Commander
  • Doors: 4
  • Raised Roof: Yes
  • Front Bumper: Extended
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel

Pump & Tank

  • Pump Make/Model: Waterous
  • Pump Capacity: 1750 GPM
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 1000 USG
  • Foam Capacity: 30 USG

Body

  • Body Type: Aluminum
  • Misc. Features: Roll up compartment doors

Equipment

  • Generator: 10 kW

Dimensions

Construction

  • Factory: Wyoming, MN
  • Dealer: Garrison Fire & Rescue
  • Construction Complete: February 2019
  • Delivery Date: April 25, 2019

Disposition