13-99 (2021)

From Rockland Apparatus
Revision as of 01:27, 20 February 2022 by Admin (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
13-99
Overview
Year 2021; 3 years ago (2021)
Manufacturer Pierce
Type Aerial
Chronology
Predecessor 1991 Pierce/Smeal Ladder (13-75)


At-a-Glance
Model Enforcer
Sub Type Ladder
Serial Number 35107
Features
Aerial Height 107'
Pump Capacity 2000 GPM
Water Capacity 480 USG
Foam Capacity 20 USG
Notable Dates
Delivery March 31, 2021
In Service April 1, 2021

General

  • Apparatus Type: Aerial
  • Apparatus Sub Type: Ladder
  • Manufacturer: Pierce
  • Year: 2021
  • Serial Number: 35107
  • VIN: 4P1BCAFF0MA022735
  • Color: White over red

Chassis/Cab

  • Model: Enforcer
  • Cab Material: Aluminum
  • Crew Capacity: 8
  • Doors: 4
  • Front Bumper: 19" extended
  • Length: 158 inches (13 ft 2 in) overall, 70 inches (5 ft 10 in) crew cab
  • Tilt: Full

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins L9
  • Engine Specs: 9 L, 450 hp, 1250 lb-ft, Inline 6
  • Transmission Make/Model: Allison 3000EVS
  • Transmission Specs: 6-speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CSU
  • Pump Capacity: 2000 GPM, single-stage
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 480 USG
  • Foam System: Husky 3
  • Foam Capacity: 20 USG

Aerial

  • Aerial Model: Ascendant
  • Mounting: Rear
  • Vertical Reach: 107'
  • Horizontal Reach: 100'
  • Sections: 4
  • Material: Steel
  • Tip Load: 750 lbs dry, 500 lbs wet
  • Prepiped Waterway: Yes
  • Outriggers: 1 set of H-style (18' spread) & 1 down-jack

Body

  • Material: Aluminum
  • Misc. Features: Rollup compartment doors

Equipment

Dimensions

  • Overall Height: 140 inches (11 ft 8 in)
  • Overall Length: 469.50 inches (39 ft 1.50 in)
  • Wheelbase: 234 inches (19 ft 6 in)

Construction

  • Factory: Appleton, WI
  • Dealer: Firematic Supply
  • Cost: $1,065,000 (equivalent to $1,197,487 in 2023)
  • Construction Started: December 2020
  • Construction Complete: February 2021
  • Delivery Date: March 31, 2021

Disposition

  • In Service Date: April 1, 2021


CAD Drawing: PDF 2021 Pierce 13-99 CAD Drawing