13-Squad (2014)

From Rockland Apparatus
Revision as of 23:11, 24 March 2019 by Other Admin (talk | contribs) (Text replacement - "| year = 2014 | manufacturer" to "| year = {{Start date and age|2014|df=y}} | manufacturer")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
13-Squad
Overview
Year 2014; 10 years ago (2014)
Manufacturer Pierce
Type Pumper
Chronology
Predecessor 1997 Pierce Pumper (13-1000)


At-a-Glance
Model Saber
Sub Type Rescue-Pumper
Serial Number 27195
Features
Pump Capacity 1000 GPM
Water Capacity 500 USG
Foam Capacity 50 USG
Notable Dates
Delivery April 2014
In Service May 17, 2014
Dedication September 27, 2014

General

  • Apparatus Type: Pumper
  • Apparatus Sub Type: Rescue-Pumper
  • Manufacturer: Pierce
  • Year: 2014
  • Serial Number: 27195
  • VIN: 4P1CS01A4EA014359
  • Color: White over red
  • NIMS Resource Typing: Engine Type I

Chassis/Cab

  • Model: Saber
  • Cab Material: Aluminum
  • Crew Capacity: 8
  • Doors: 4
  • Raised Roof: 12"
  • Front Bumper: 13" extended with preconnect and winch receiver
  • Length: 135.75 inches (11 ft 3.75 in) overall, 57 inches (4 ft 9 in) crew cab
  • Tilt: Full
  • Misc. Features: Onspot chains

Drivetrain

  • Propulsion: Diesel
  • Engine Make/Model: Cummins ISL9
  • Engine Specs: 8.9 L, 400 hp, 1250 lb-ft, Inline 6
  • Transmission Make/Model: Allison 3000 EVS
  • Transmission Specs: 5-speed automatic

Pump & Tank

  • Pump Make/Model: Waterous CM
  • Pump Capacity: 1000 GPM, two-stage
  • Pump Location: Midship
  • Drive Type: Split-shaft
  • Water Capacity: 500 USG
  • Foam System: Pierce Husky 12
  • Foam Type: Class B
  • Foam Capacity: 50 USG

Body

  • Material: Aluminum
  • Length: 136 inches (11 ft 4 in)

Equipment

  • Generator: Harrison Hydra-Gen MCR 10 kW hydraulic
  • Reels: 2 hydraulic, 1 electrical
  • Winch: Warn 9000 lb portable with receivers at front, rear, sides

Construction

  • Factory: Bradenton, FL
  • Dealer: Firematic Supply
  • Cost: $498,441 (equivalent to $641,513 in 2023)
  • Construction Started: January 13, 2014
  • Construction Complete: March 28, 2014
  • Delivery Date: April 2014

Disposition

  • In Service Date: May 17, 2014
  • Dedication Date: September 27, 2014