18-750 (1930): Difference between revisions

From Rockland Apparatus
Jump to navigation Jump to search
m (Text replacement - "foam_tank_capacity" to "foam_capacity")
m (Text replacement - "Category:No Image" to "")
 
(4 intermediate revisions by 2 users not shown)
Line 3: Line 3:
| image          =  
| image          =  
| caption        =  
| caption        =  
| year            = 1930
| year            = {{Start date and age|1930|df=y}}
| manufacturer    = Studebaker/Boyer
| manufacturer    = Studebaker/Boyer
| apparatus_type  = Pumper
| apparatus_type  = Pumper
| previously      =  
| previously      =  
| subsequently    =  
| subsequently    =  
| predecessor    =  
| predecessor    = [[18-CH (1918)|1918 Studebaker/Childs Chemical Wagon (18-CH)]]
| successor      = [[18-750 (1949)|1949 Mack Pumper (18-750)]]
| successor      = [[18-750 (1949)|1949 Mack Pumper (18-750)]]
}}
}}
Line 48: Line 48:
| pump_panel        =  
| pump_panel        =  
| pump_drive        =  
| pump_drive        =  
| tank_capacity      = 80 USG
| water_capacity    = 80 USG
| foam_system        =  
| foam_system        =  
| foam_type          =  
| foam_type          =  
| foam_capacity =  
| foam_capacity     =  
| hose_reel          =  
| hose_reel          =  
| pump_features      =  
| pump_features      =  
Line 101: Line 101:
[[Category:Pumper]]
[[Category:Pumper]]
[[Category:Stony Point FD]]
[[Category:Stony Point FD]]
[[Category:No Image]]

Latest revision as of 23:07, 25 May 2020

18-750
Overview
Year 1930; 94 years ago (1930)
Manufacturer Studebaker/Boyer
Type Pumper
Chronology
Predecessor 1918 Studebaker/Childs Chemical Wagon (18-CH)
Successor 1949 Mack Pumper (18-750)


General

  • Apparatus Type: Pumper
  • Manufacturer: Studebaker/Boyer
  • Year: 1930
  • Color: Red

Chassis/Cab

  • Manufacturer: Studebaker
  • Cab Type: Open

Drivetrain

Pump & Tank

  • Pump Capacity: 750 GPM
  • Water Capacity: 80 USG

Body

  • Manufacturer: Boyer

Equipment

Dimensions

Construction

  • Factory: South Bend, IN
  • Cost: $8,500 (equivalent to $137,879 in 2021)
  • Construction Started: June 30, 1930
  • Construction Complete: October 4, 1930
  • Delivery Date: October 11, 1930

Disposition

  • In Service Date: 1930
  • Out of Service Date: 1949